As an ENERGY STAR® Partner, Burnham Hydronics has determined that this boiler meets the ENERGY STAR® guidelines for energy efciency established by
102. Screw the water supply manifold into the boiler outlet tapping “O.”3. Orient the manifold with the relief valve on top.4. Screw the relief val
117. Screw an installer-supplied 1¼” pipe or nipple into the water return tapping “R”.8. Screw the supplied drain valve into tapping “D”.6. CONNECT
12 DISCONNECT ELECTRICAL POWER to the boiler and heating system before servicing. Positively assure that no voltage is present. Lock ele
13Using IQ Boiler Control Display8. PROGRAM THE CONTROLSViewing the Operating Mode OptionsIn operating mode the user may view (but not change) boiler
14Unit DisplayORSample Display1 sec1 sec1 sec Please note that in operating mode to hold the display on the value the user can press and hold either t
159. CHECK FOR GAS AND WATER LEAKS GAS LEAKS may result in re or explosion. WATER LEAKS may cause extensive property dam
1610-b10. PERFORM STARTUP CHECKS AND ADJUSTMENTS FAILURE TO PERFORM THESE CHECKS of the boiler's combustion and safety systems may
17ANNUAL MAINTENANCE CHECKLIST WARNINGSTHE BOILER CONTAINS REFRACTORY CERAMIC FIBER, a possible human carcinogen Use a NIOSH approved respirator whe
18TROUBLESHOOTINGIQ Boiler Control Status Codes (when "Err" is not displayed)Display Status Boiler / Control Action(s)BlankBoiler and Circul
19If "Err" IS displayed on the IQ Boiler Control: "Err" ashes on the IQ Boiler control display followed by a number. Use the fo
2FOLLOW ALL INSTRUCTIONS and warnings printed in this manual and posted on the boiler.INSPECT THE BOILER ANNUALLY. To keep your boiler safe and efcie
20TROUBLESHOOTING (continued)If IQ Boiler Control Shows Status Code “STA 15": The IQ Boiler Control is “Waiting for Limit to Close” and the dis
21Key No.Description[Quantity] Part Number ES23 ES24 ES25 ES26 ES27 ES28 ES291A Block Assembly 102287-03 102287-04 102287-05 102287-06 102287-07 10228
22REPAIR PARTS LIST (continued)Key No.Description[Quantity] Part Number ES23 ES24 ES25 ES26 ES27 ES28 ES292A Base Wrapper 71807031 71807041 71807051 7
23REPAIR PARTS LIST (continued)Key No.Description[Quantity] Part Number ES23 ES24 ES25 ES26 ES27 ES28 ES293AGas Valve (Natural Gas), Honeywell VR8204P
24REPAIR PARTS LIST (continued)Key No.Description[Quantity] Part Number ES23 ES24 ES25 ES26 ES27 ES28 ES294A IQ Boiler Control 102289-014B IQ Option P
25Key No.Description[Quantity] Part Number ES23 ES24 ES25 ES26 ES27 ES28 ES295A Jacket Left Side Panel 102566-015B Jacket Right Side Panel 102567-015C
26REPAIR PARTS LIST (continued)Key No.Description[Quantity] Part Number ES23 ES24 ES25 ES26 ES27 ES28 ES296A Supply Water Manifold 806070016B Temperat
27INTERNAL WIRING Figure IW-1: Wiring Diagram
28INTERNAL WIRING (continued)Figure IW-2: Wiring Schematic
29Figure IW-3: Single Zone System with Domestic Hot Water TankFigure IW-4: Multiple Zone System with Zone CirculatorsINTERNAL WIRING (continued)
352134Congratulations on your purchase of a new Burnham® boiler—designed and constructed to provide you with years of reliable service. • ENERGY STA
30Figure IW-5: Multiple Zone System with Zone ValvesFigure IW-6: Multiple Zone System with Zone Circulator PanelINTERNAL WIRING (continued)
31T STAT 1VALVE 1T STAT 2VALVE 2T STAT 3OFFONZONE 4 PRIORITYTACO ZVC 404 (OR EQIV.)FOUR ZONE ZONE VALVE CONTROLWITH OPTIONAL PRIORITYTHERMOSTATBOILER
32APPENDIX A – COMBUSTION AIR PROVIDE ENOUGH AIR to ventilate the boiler room, dilute the ue gases, and sustain combustion. Ignition fail
33APPENDIX B – VENTING VENT THIS BOILER according to the instructions. Failure to do so may cause products of combustion to enter the buil
34APPENDIX B1 – ATMOSPHERIC VENTINGFigure B-1: Typical Atmospheric Vent Installation GENERAL WARNINGS FOR ATMOSPHERIC VENTING SYSTEMSUSE ATMOSPHERI
35THIS PAGE INTENTIONALLY LEFT BLANK
36APPENDIX C – GAS PIPING ASSURE GAS PIPING IS LEAK FREE AND OF PROPER SIZE and type for the connected load. SHUT OFF MAIN GAS SUPPLY
375. Bond all above-ground gas piping to a grounding electrode and ensure the piping is electrically continuous. DO NOT USE GAS PIPING AS A
38(2) Comply with the boiler’s specic water quality requirements. See the Specifications Section of this manual.(3) Comply with the boiler’s
39Figure D-0: Piping Schematic SymbolsAPPENDIX D – System Piping (continued)
4ES2 SeriesBoiler ModelInput (MBH) DOE Heating Capacity (MBH) Net I=B=R Rating (MBH) AFUE (%)ES23 70 59 51 85ES24 105 88 77 85ES25 140 118 102 85ES26
40Figure D-W1: Water Boiler, Series LoopAPPENDIX D – System Piping (continued)Figure D-W2: Water Boiler, Two or More Zones
41Figure D-W3: Water Boiler, Tankless Coil, Two or More ZonesAPPENDIX D – System Piping (continued)Figure D-W4: Water Boiler, Indirect Water Heater,
42APPENDIX D – System Piping (continued)Figure D-W5: Water Boiler, Indirect Water HeaterFigure D-W6: Multiple Water Boilers, Indirect Water Heater,
43APPENDIX E – FILLING THE SYSTEM AND CHECKING FOR LEAKSFill entire heating system with water and vent air from system. Use the following procedure o
44APPENDIX F – ADJUSTING GAS INPUT RATENatural Gas Boilers:1. Turn off gas supply to all appliances other than gas-red boiler.2. Note the rated man
45Seconds for Two (2) RevolutionsSize of Gas Meter DialOne-Half Cu. Ft.OneCu. Ft.TwoCu. Ft.24 150.0 300.0 450.026 138.4 276.9 415.328 128.5 257.1 385.
46APPENDIX G – CHECKING DRAFT AND COMBUSTIONCHECK DRAFT (GAS BOILERS WITH DRAFT HOODS)1. Insofar as is practical, close all doors and windows in the
47The IQ Boiler Control stores two boiler supply temperature setpoints in its memory; one setpoint is for the High Limit Setting and the second is for
48APPENDIX H – IQ Control System (continued)IQ Option Cards: For example, if additional safety limits are required, select Manual or Automatic Reset A
49The LCD Display kit includes a mounting bracket and wiring harness to allow simple physical installation and “plug-in” style electrical connection.
5Figure S-1: Minimum Clearances to Combustibles and Closet DimensionsSPECIFICATIONS (continued)
50APPENDIX H – IQ Control System (continued)Burnham Part NumberItem Description102723-01Outside Reset IQ Option Card, Domestic Hot Water Priority, for
51SERVICE RECORDDATE SERVICE PERFORMED
52LLiimmiitteeddWWaarrrraannttyyFFoorrRReessiiddeennttiiaallGGrraaddeeWWaatteerraannddSStteeaammBBooiilleerrssUsing Cast Iron, Carbon Steel, Cast Alum
6Installation: 1. Unpack the crate ... 7 2. Position t
7 THE BOILER IS TOP-HEAVY. Do not allow it to tip over.1. Remove the sleeve. 2. Remove the contents from the skid, except the boiler.
84-a3. PROVIDE COMBUSTION AIR INSUFFICIENT COMBUSTION AIR SUPPLY may result in the production and release of deadly carbon monoxide (C
94. CONNECT VENTING (continued)Model ES23 ES24 ES25 ES26 ES27 ES28 ES29Input (MBH) 70 105 140 175 210 245 280Minimum Vent Diameter (in)4 5 6 6 7 7 8V
Comments to this Manuals