Burnham ALP150 Specifications

Browse online or download Specifications for Water heaters & boilers Burnham ALP150. Burnham ALP150 Specifications User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 100
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
101602-01R2-9/08
Price - $5.00
DNAGNITAREPO,NOITALLATSNI
ROFSNOITCURTSNIECIVRES
ENIPLA
YCNEICIFFEHGIHGNISNEDNOC
TNEVTCERID
RELIOBRETAWTOHDERIF-SAG
As an ENERGY STAR
®
Partner, Burnham Hydronics has determined that the Alpine™ Series meets the ENERGY
STAR
®
guidelines for energy efciency established by the United States Environmental Protection Agency (EPA).
WARNING: Improper installation, adjustment, alteration, service or maintenance can cause property damage,
injury, or loss of life. For assistance or additional information, consult a qualied installer, service agency or the
gas supplier. This boiler requires a special venting system. Read these instructions carefully before installing.
Page view 0
1 2 3 4 5 6 ... 99 100

Summary of Contents

Page 1 - RELIOBRETAWTOHDERIF-SAG

101602-01R2-9/08Price - $5.00DNAGNITAREPO,NOITALLATSNIROFSNOITCURTSNIECIVRES™ENIPLAYCNEICIFFEHGIHGNISNEDNOCTNEVTCERIDRELIOBRETAWTOHDERIF-SAG As an EN

Page 2

10IV. VentingWARNINGFailure to vent this boiler in accordance with these instructions could cause products of combustion to enter the building result

Page 3

100e. Boilers installed outside the 48 contiguous United States, the State of Alaska, and Canada.f. Damage to the boiler and /or property due to in

Page 4 - Table of Contents

112. The Alpine™ is designed to be installed as a Direct Vent boiler. The air for combustion is supplied directly to the burner enclosure from outdo

Page 5

12Vent Pipe Pipe Direction EnclosureMinimum Clearance ToCombustible Material, InchesCPVC/PVC Venting Vertical or Horizontal Enclosed at all Sides 1” V

Page 6

13Boiler Model3” Combustion Air Pipe(Equivalent Length)4” Combustion Air Pipe (Equivalent Length)3” Vent Pipe (Equivalent Length)4” Vent Pipe (Equival

Page 7

146. Remove the Silicone ue sensor cap from the vent carton and press onto the two pipe vent system connector for CPVC/PVC sensor port. Remove the

Page 8

156. Install Rodent Screen and Vent Terminal (supplied with boiler), see Figure 8 for appropriate conguration.7. Apply sealant between vent pipe an

Page 9 - III. Unpacking Boiler

167. Install Rodent Screen and Combustion Air Terminal (supplied with boiler), see Figure 8 for appropriate conguration.8. Apply sealant between ve

Page 10 - IV. Venting

17a. Size roof opening to maintain minimum clearance of 1 inch from combustible materials.b. Extend vent pipe to maintain minimum vertical and horiz

Page 11

187. Brace exterior piping if required.Combustion Air Piping - Vertical1. See Paragraph D for instructions on attaching the vent system connector to

Page 12

195. Install maximum vertical run of seven (7) feet of Schedule 40 PVC vent pipe. See Figure 11.6. At top of vent pipe length install another PVC

Page 13

2IMPORTANT INFORMATION - READ CAREFULLYNOTE: The equipment shall be installed in accordance with those installation regulations enforced in the area

Page 14 - Vent Piping - Horizontal

20Figure 12: Field Installation of Boiler Concentric Vent Collarcodes. Contact local building or re ofcials about restrictions and installation in

Page 15

21The direct vent termination location is restricted as follows:a. Minimum twelve (12) inches above grade plus normally expected snow accumulation le

Page 16 - Vent Piping - Vertical

22b. Measure dimension “L” from exterior wall outer surface to the end of the last tting (or end of installed Boiler Concentric Vent Collar). See F

Page 17

23i. Install the supplied Inside Wall Plate onto the shortened Horizontal (Wall) Terminal interior end and move the plate to cover interior wall cut

Page 18 - Vent Piping - Snorkel

24Figure 19: Vertical Concentric Vent Installationouter pipes to start the screw. Use a drill stop or other means to ensure that the drill bit does n

Page 19 - Comments

25Figure 22: Cutting Straight PipeFigure 23: Joining Cuttable PipeFigure 24: Joining Non-Cuttable Pipeb. Push the male end of the rst tting into

Page 20 - Combustible Material, Inches

26Figure 26: Cutting Vertical Terminala. Determine the centerline of the terminal location on the roof. For at roof, cut either 5-1/2” diameter ho

Page 21

27Table 10: Cut-To-Length Extensions (Cuttable)Part No. Component Description Size101163-01Cut-To-Length Extension, 500 mm (19-1/2”)80/125 mm101162-01

Page 22

28Figure 28: Chimney Chase Installation

Page 23

29V. Condensate DisposalA. Condensate Trap and Drain Line.1. All condensate, which forms in the boiler or vent system, collects in the sump under he

Page 24

3WARNINGThis boiler requires regular maintenance and service to operate safely. Follow the instructions contained in this manual.Improper installatio

Page 25

30Figure 29: Condensate Trap and Drain Line

Page 26

31NOTICEOxygen contamination of boiler water will cause corrosion of iron and steel boiler components, and can lead to boiler failure. Burnham’

Page 27 - Chimney Chase Installation

321. ALP080 thru ALP285 Boiler Models a. Locate and remove ¾” NPT x close black nipple, ¾” NPT black tee, ¾” MPT x ¾” FPT Pressure Relief Valve, ¾”

Page 28

33B. Piping System To Be Employed. Alpine (ALP) boilers are designed to operate in a closed loop pressurized system. Minimum pressure in the boiler

Page 29 - V. Condensate Disposal

34Table 12A: Recommended Circulator Models for Alpine (ALP) Boilers Based on 25°F Temperature Differential and Up to 75 ft. Eq

Page 30

35Boiler ModelBoiler Supply Connection, Inch, FPTBoiler Return Connection, Inch, FPTNear-Boiler Piping Supply Pipe Size, InchNear-Boiler Piping Return

Page 31 - VI. Water Piping and Trim

36Table 12B (continued): Space Heating with Indirect Water Heating - Recommended Circulator Models for Alpine (ALP) Boilers and Al

Page 32

37Table 13: Fitting and Valve Equivalent LengthCopper Fitting and Sweat Valve Equivalent Length (Ft)Fitting or ValveDescriptionCopper Pipe or Valve S

Page 33 - Boiler Head Loss (Feet)

38Figure 31A: Near Boiler Piping - Heating Only (with Central Heating Circulators)

Page 34

39Figure 31B: Near Boiler Piping - Heating Only (with Central Heating Zone Valves)

Page 35

4Table of Contents I. Product Description, Specifications and Dimensional Data...4 II. Pre-Installation ...

Page 36

40Figure 32A: Near Boiler Piping - Heating Plus Indirect Water Heater (with Central Heating Circulators)

Page 37

41Figure 32B: Near Boiler Piping - Heating Plus Indirect Water Heater (with Central Heating Zone Valves)

Page 38

42Figure 32C: Near Boiler Piping - Heating (with Central Heating Circulators) Plus Alternately Piped Indirect Water Heater

Page 39

43Figure 32D: Near Boiler Piping - Heating (with Central Heating Zone Valves) Plus Alternately Piped Indirect Water Heater

Page 40

44NOTICEWhere it is not possible to install a separate boiler loop, the system circulator must be sized to ensure that the ow through boiler stays wi

Page 41

45D. Special Situation Piping Installation Requirements Observe the following guidelines when making the actual installation of the boiler piping fo

Page 42

46VII. Gas PipingWARNINGFailure to properly pipe gas supply to boiler may result in improper operation and damage to the boiler or structure. Alway

Page 43

47Table 14B: Maximum Capacity of Schedule 40 Black Pipe in CFH* (LP Gas) For Gas Pressures of 0.5 psig or Less Inlet Pressure 11.0 Inch W.C.; 0

Page 44

48C. Pressure test. See Table 17 for Alpine Min./Max. Pressure Ratings. The boiler and its gas connection must be leak tested before placing boiler

Page 45

49VIII. ElectricalA. General. Install wiring and electrically ground boiler in accordance with authority having jurisdiction or, in the absence of s

Page 46 - VII. Gas Piping

5Figure 1A: Alpine™ - Models ALP080 thru ALP210

Page 47

50• Black – Line voltage “hot”• White – “Neutral” for boiler and circulators• Red – “Heating” circulator “hot”• Blue – “Indirect Water Heater “ ci

Page 48

51Figure 35: Wiring Connections Diagram

Page 49 - VIII. Electrical

52Figure 36: Ladder Diagram

Page 50

53Figure 37A: Modied Wiring For DHW Priority When Using Low Flow Circulator Piped Off System Header -Heating (with Central Heating Circulators) Plus

Page 51

54Figure 37B: Modied Wiring For DHW Priority When Using Low Flow Circulator Piped Off System Header -Heating (with Central Heating Zone Valves) Plus

Page 52 - Figure 36: Ladder Diagram

55Figure 38: Wiring for MCBA Modulating Boiler Control Time Delay Relay Box5. If the boiler installation site may be subject to low supply voltage c

Page 53

56IX. Boiler Stacking For installations with unusually high space heating and/or domestic hot water heating loads, where employing two (2) Alpine (A

Page 54

57vertical (roof) vent terminals, if level with each other, are spaced no closer then 12 inches horizontally. If vertical vent terminals cannot end i

Page 55

58X. Modular InstallationA. General Guidelines1. Read and follow all venting, combustion air, water piping, gas piping and electrical instructions

Page 56 - IX. Boiler Stacking

59Figure 40: Modular Boiler Direct Vent Termination

Page 57

6Figure 1B: Alpine™ - Models ALP285 thru ALP399

Page 58 - X. Modular Installation

60Figure 41: Modular Boiler Concentric Vent Termination

Page 59

61 If vertical vent terminals cannot end in one plane, they must be spaced no closer than three (3) feet horizontally.6. Chimney chase concentric ve

Page 60

62Figure 42: Modular Boiler Water Piping w/Domestic Hot Water HeaterNOTICEInstalling a low water cutoff in the system piping of modular boilers is st

Page 61 - E. Modular Boiler Electrical

63Figure 43: Modular Boiler Water Piping w/Domestic Hot Water Heater (Continued)

Page 62

64Figure 44: Modular Wiring Diagram w/Tekmar 265 ControlTekmar 265 Based Control System (or equal)Sequence of OperationThe Tekmar 265 Control (or equ

Page 63

65Tekmar 264 Based Control System (or equal)Sequence of OperationThe Tekmar 264 Control (or equal) can control up to four (4) boilers and an Indirect

Page 64

66A. Verify that the venting, water piping, gas piping and electrical system are installed properly. Refer to installation instructions contained in

Page 65

67Alpine™ Series Lighting and Operating InstructionsFigure 46: Lighting Instructions

Page 66

68H. Purge Air From Gas Train Upon initial start-up, the gas train will be lled with air. Even if the gas line has been completely purged of air,

Page 67

69Boiler ModelGas Valve Size (NPT)(Dungs)Gas Valve ModelFuel ConvertedPlanned Installation Altitude RangeFrom ToALP0801/2”GB-WND 055 D01 S00 253082Nat

Page 68

7Table 2A: Rating Data - Models ALP080 thru ALP399 (0 to 2000 Feet Elevation Above Sea Level)Table 2B: Rating Data - Models ALP080 thru ALP399 (2001

Page 69 - O. Adjust Thermostats

706. After the burner lights, force the burner to high re by simultaneously pressing and holding the “Mode” button and “+“ button. After a few seco

Page 70

71FuelInlet Pressure (Inches w.c.)Min. Max.Natural Gas 4.0 14.0LP 11.0 14.0Table 24: Inlet Pressure Limits• Apply the “Boiler Conversion Label” to

Page 71 - Min. Max

72XII. OperationA. The Alpine (ALP) boiler uses a microprocessor based Honeywell control, known as a “MCBA”, to manage all boiler functions including

Page 72 - XII. Operation

73Table 25: Parameter DescriptionsAccess CodeParameter No.DescriptionFactory SettingALP080 ALP105 ALP150 ALP210 ALP285 ALP399No Access Code Needed1 T

Page 73 - Access Code Required

74Figure 50: Basic Menu Tree

Page 74 - Figure 50: Basic Menu Tree

75D. Two basic types of errors codes are shown on the display:1. Soft Lockout Codes – When a soft lockout occurs, the boiler will shut down and the

Page 75 - Boiler Status

76Figure 51: Outdoor Reset CurveII. Field Adjustable Boiler Operating Parameters MCBA control factory programmed operating parameters

Page 76 - Parameters

77Figure 52: Expanded Menu Tree (Cont’d on next page)

Page 77

78Figure 52: Expanded Menu Tree (cont’d.)Figure 53: Adjusting Boiler Water Reset Curve

Page 78

7914; Parameter 13 denes the “thousands” and hundreds” places and Parameter 14 denes the “tens” and “ones” places. The ignition fan speed is only a

Page 79

8WARNINGIf you do not follow these instructions exactly, a re or explosion may result causing property damage or personal injury.DANGERDo not

Page 80

80B. Adjusting Parameters via Personal Computer with GCI Interface1. Operating System Requirements The GCI Interface requires a PC computer running

Page 81

81Figure 55: Gascom Menu Tree4. Double-click on the desired parameter. A window will open with either a eld or a pull down list of options will ap

Page 82 - B. NTC Temperature Sensors

82III. Component Test Procedures A. Flame Signal Check1. The ame signal can be checked between terminal number 7 on the low voltage terminal

Page 83

83Table 27: NTC Sensor Resistance Values

Page 84 - XIII. Service and Maintenance

84XIII. Service and MaintenanceNOTICEWarranty does not cover boiler damage or malfunction if the following steps are not performed at the intervals sp

Page 85

853. Inspect the wiring to verify the conductors are in good condition and attached securely.CAUTIONLabel all wires prior to disconnection when servi

Page 86

86b. Equivalent system freeze protection products may be used in lieu of product referenced above. In general, freeze protection for new or existing

Page 87

87Figure 57: Condensate Overow Switch Orientation

Page 88 - XIV: Troubleshooting

88XIV: TroubleshootingFigure 58: MBCA Fuse LocationCONDITION POSSIBLE CAUSESDisplay Blank, Fan off, LWCO lights off • No 120VAC Power at boiler. Che

Page 89

89B. Trouble shooting problems where a soft lockout code is displayed. When a soft lockout occurs, the boiler will shut down and the display will alt

Page 90

9III. Unpacking BoilerCAUTIONDo not drop boiler. A. Move boiler to approximate installed position.B. Remove all crate fasteners.C. Lift and remo

Page 91 - XV. Repair Parts

90Table 30: Hard Lockout Codes DisplayedCODE CONDITION POSSIBLE CAUSES E 00A ame signal was present when there should be no ame.• Defective gas val

Page 92 - (Quantity) Part Number

91XV. Repair Parts All Alpine™ Series Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require assistance

Page 93

92Key No.Description(Quantity) Part NumberALP080 ALP105 ALP150 ALP210 ALP285 ALP3991 Heat Exchanger, Burner, Etc. (Key No’s 2 thru 23) 101520-01 10152

Page 94

93Key No.Description(Quantity) Part NumberALP080 ALP105 ALP150 ALP210 ALP285 ALP39923Gas Train Assembly(Key No’s 24 thru 29)101585-01 101585-02 101585

Page 95

94Key No.Description(Quantity) Part NumberALP080 ALP105 ALP150 ALP210 ALP285 ALP39935 Air Pressure Switch 80160762 101862-0136 Air Pressure Switch Hos

Page 96

95Key No.Description(Quantity) Part NumberALP080 ALP105 ALP150 ALP210 ALP285 ALP39942 Wiring Harness (Not Shown) 101454-0143MCBA Slide Out Assembly(In

Page 97

96Key No.Description(Quantity) Part NumberALP080 ALP105 ALP150 ALP210 ALP285 ALP39930 Rubber Grommet, Gas Line 820SOL0001101638-0151 Jacket, Rear/Bott

Page 98 - ISCELLANEOUS PARTS CARTON

97Key No.Description(Quantity) Part NumberALP080 ALP105 ALP150 ALP210 ALP285 ALP39934 Flue Temp Sensor 101687-0142 Wire Harness (Not Shown) 101454-017

Page 99

98Key No. Description(Quantity) Part NumberALP080 ALP105 ALP150 ALP210 ALP285 ALP399MISCELLANEOUS PARTS CARTON101777-01 101777-02 101777-0373 Temperat

Page 100 - Limited Warranty

99Important Product Safety InformationRefractory Ceramic Fiber ProductWarning:The Repair Parts list designates parts that contain refractory ceramic f

Comments to this Manuals

No comments