Burnham LEDV SERIES User Manual

Browse online or download User Manual for Water heaters & boilers Burnham LEDV SERIES. Burnham - Geisel

  • Download
  • Add to my manuals
  • Print
  • Page
    / 36
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
1
Price - $3.00
INSTALLATION, OPERATING AND
SERVICE INSTRUCTIONS FOR
LEDV SERIES DIRECT VENT
OIL FIRED BOILER
81433101R3-3/00
As an ENERGY STAR Partner, Burnham Corporation has determined that the LEDV-1, fired at the 0.60 GPH rate,
meets the ENERGY STAR guidelines for Energy efficiency established by the United States Environmental Protection
Agency (EPA).
For service or repairs to boiler, call your heating contractor. When seeking information on boiler, provide
Boiler Model Number and Serial Number as shown on Rating Label.
Boiler Model Number
LEDV__ - _______
Boiler Serial Number
6 _ _ _ _ _ _ _
Installation Date
Heating Contractor Phone Number
Address
Page view 0
1 2 3 4 5 6 ... 35 36

Summary of Contents

Page 1 - OIL FIRED BOILER

1Price - $3.00INSTALLATION, OPERATING ANDSERVICE INSTRUCTIONS FORLEDV SERIES DIRECT VENTOIL FIRED BOILER81433101R3-3/00As an ENERGY STAR Partner, Burn

Page 2

10Figure 5: Recommended Boiler Piping for Zoning with ValvesD. Install Drain Valve in return piping. See figure 5.E. Oil, grease, and other foreign m

Page 3

11Figure 6: Recommended Piping for Combination Heating & Cooling (Refrigeration) SystemsFigure 7: Recommended Boiler Piping for Zoning with Circ

Page 4

12IV. Venting / Air Intake PipingA. General Guidelines1. Vent system installation must be in accordance withthese instructions and applicable provisi

Page 5 - Table of Contents

136. Intake Terminal Location (Direct Vent only) - LocateAir Intake Terminal not less than 12 inches to theleft, right, or bottom of the vent terminal

Page 6 - I. Pre-Installation

14Figure 10: Vent InstallationFigure 11: Vent Connector, Un-Assembled

Page 7 - II. Unpack Boiler

15Figure 13: Air Intake InstallationFigure 12: Vent Connector, Assembled

Page 8 - TS-98-14-A

16e. Secure the inside trim plate to inside wall.f. Tighten the gear clamp to the terminal pipe.g. Seal all external joints with a weatherproof caulk.

Page 9 - III. Water Piping and Trim

176. Install air intake terminal. See Figure 13.7. Seal all external joints with weatherproof caulk.D. Air Intake Installation (Indoor Air for Combu

Page 10

18V. Electrical and Sequence of OperationsA. ELECTRICAL1. Install wiring and ground boiler in accordance withrequirements of authority having jurisdi

Page 11

19Figure 15: Schematic Wiring Diagram

Page 12 - A. General Guidelines

2IMPORTANT INFORMATION - PLEASE READ THIS PAGE CAREFULLYThe following terms are used throughout this manual to bring attention to the presence of haza

Page 13

20VI. Oil PipingA. General1. Use flexible oil line(s) so that Swing Door can beopened without disconnecting oil supply.2. A supply line fuel oil filt

Page 14 - Figure 10: Vent Installation

21C. Two-Pipe Oil Lines.1. For two-pipe systems where more lift is required,the two-stage fuel unit is recommended. Table 2(single-stage) and Table 3

Page 15

22VII. System Start-upA. ALWAYS INSPECT INSTALLATION BEFORESTARTING BURNER.B. FILL HEATING SYSTEM WITH WATER. Refer toSection III, G.C. CHECK CONTROL

Page 16

237. Bleed the fuel unit when the burner motor startsrotating. To bleed, loosen the vent fitting (withplastic hose attached) and catch the oil in an

Page 17

24i. Fitting leaks due to mis-flared tubing ordamaged fitting.ii. Fuel line leak due to crushed or bent tubing.iii. Filter connection leaks.iv. Tank c

Page 18 - B. SEQUENCE OF OPERATIONS

25FOR HEATING SERVICEMAN ONLYa. Simulate flame failure:• Follow the starting procedure to turn on theburner.• Close the hand valve in the oil supply l

Page 19

26Section VIII: Service and CleaningA. General. Inspection, service and cleaning should beconducted annually. Turn off electric power and closeoil s

Page 20 - VI. Oil Piping

272. Remove and clean the pump strainer (if applicable).3. Replace the nozzle with an equivalent nozzle. SeeTable 4.4. Clean and inspect the electrod

Page 22 - VII. System Start-up

29IX. Repair PartsAll LEDV Series Repair Parts may be obtained through your local Burnham Wholesale Distributor. Shouldyou require assistance in loca

Page 23

3NOTICEThis boiler has a limited warranty, a copy of which is printed on the back of this manual.It is the responsibility of the installing contractor

Page 24 - G. TEST CONTROLS

30Figure 19: LEDV Boiler Trim & Controls

Page 25

31Figure 20: LEDV Boiler Jacket & Insulation

Page 26 - D. Burner

32Figure 21: LEDV Bare Boiler Assembly

Page 27

33Figure 22: Vent Kit Repair Parts

Page 28 - Service Notes

34Figure 23: Beckett AFII Oil Burner Repair PartFor replacement oil burner parts, contact your wholesaler or the burner manufacturer: R.W. Beckett C

Page 29 - IX. Repair Parts

35 BECKETT AFII BURNER REPLACEMENT PARTSPart DescriptionLEDV1 LEDV2 LEDV3Beckett Part NumberComplete Burner (without Primary Control) BCB5406 BCB5407

Page 31

4NOTICEAll boilers must be installed in accordance with National, State and Local Plumbing, Heatingand Electrical Codes and the regulations of the ser

Page 32

5Figure 1: LEDV Packaged BoilerTable of ContentsI. Pre-Installation ... 6II. Unpack Boiler ...

Page 33

6A. INSPECT SHIPMENT carefully for any signs ofdamage.1. ALL EQUIPMENT is carefully manufactured,inspected and packed. Our responsibility ceasesupon d

Page 34

7II. Unpack BoilerCAUTIONDo not drop boiler. Do not bump boiler jacketagainst floor.A. REMOVE CRATE1. Remove all fasteners at crate skid.2. Lift outsi

Page 35

8Figure 4: Hinge AssemblyFigure 3: Proper Hinge Bracket InstallationTS-98-14-AFigure 2: Minimum Clearances to Combustible Materials

Page 36

9III. Water Piping and TrimA. Design and install boiler and system piping toprevent oxygen contamination of boiler water.There are many possible cause

Comments to this Manuals

No comments