18141602R13-7/03Price - $5.00,reliobnonoitamrofnignikeesnehW.rotcartnocgnitaehruoyllac,reliobotsriaperroecivresroF.lebaLgnitaRnonwohssarebmuNlaireSdna
10Figure 5: General Assembly (Knockdown Boilers)on three sides (alcove) while maintainingclearances shown in Figure 4.F. Move boiler to permanent loca
100COMMERCIAL CAST IRON BOILERS — SERIES 5B, 8B, V9 and V11TTTTTen Year Limited Warrantyen Year Limited Warrantyen Year Limited Warrantyen Year Limite
11Figure 6: Flame Roll-out Switch InstallationFigure 7: Burner/Burner Access Panel Installation
127. Attach Lower Front Tie Bar to Left Side and RightSide Panels.8. Engage Upper Front Panel in slots on Left Side andRight Side Panels. Place Top Pa
13Figure 8: Jacket Assembly
14Figure 9: EP/OP Control Installation
15III. Gas Control System Assembly (Knockdown Boilers)A. 24V Standing Pilot Control SystemInstall Gas Control System. All components arelocated in
16b. Attach transformer/control center to junctionbox.F. EP-CSD-1 Control SystemInstall Gas Control System. All components arelocated in Combination
17Figure 10: Schematic Gas Piping, 24V Standing Pilot, 806B & 807B
18Figure 11: Main Gas Piping, Intermittent Ignition (EI)
19Figure 12: Schematic Pilot Piping (Honeywell EI), USA
2IMPORTANT INFORMATION - PLEASE READ THIS PAGE CAREFULLYNOTE: The equipment shall be installed in accordance with those installation regulations enfo
20Figure 13: Schematic Pilot Piping (Honeywell EI)Canada: Natural Gas, 805B - 810B; LP Gas, 806B - 807B
21Figure 14: Schematic Pilot Piping (Johnson EI), USA
22Figure 15: Schematic Pilot Piping (Johnson EI)Canada: Natural Gas, 805B - 810B; LP Gas, 806B - 807B
23Figure 16: Schematic Gas Piping, OP Control System, 806B - 810B
24Figure 17: Schematic Gas Piping, OP-CSD-1 Control System, 808B - 810B
25Figure 18: Schematic Gas Piping, EP Control System (Natural Gas Only), 806B - 810B
26Figure 19: Schematic Gas Piping, EP-CSD-1 Control System, 808B - 810B
27IV. Water Trim and PipingA. Design and install boiler and system piping to preventoxygen contamination of boiler water and frequent wateradditions.1
28Figure 20: Safety Relief Valve InstallationFigure 21: Drain Piping InstallationD. Install Drain Valve in rear of Left End Section, Tapping"G&
29Figure 22: Temperature-Pressure GaugeInstallationFigure 23: Alternate Temperature-PressureGauge InstallationFigure 24: Recommended Piping for Combi
3ECITON.launamsihtfokcabehtnodetnirpsihcihwfoypoca,ytnarrawdetimilasahreliobsihTyltcerroceraslortnocllatahteesotrotcartnocgnillatsniehtfoytilibisnopse
30Figure 25: Recommended Boiler Piping for Circulator Zoned Heating Systems
31A.Size gas Piping. Design system to provide adequategas supply to boiler. Consider these factors:1. Allowable pressure drop from point of delivery t
32Table 6: Maximum Capacity of Schedule 40 Pipe in CFH for Gas Pressures of 0.5 psig or LessTable 7: Equivalent Lengths of Standard Pipe Fittings &
33Figure 27: Blocked Vent Switch InstallationA. Install vent system in accordance with local buildingcodes; or local authority having jurisdiction; or
34E. Boiler Equipped With Vent Damper. See Figure 28.1. Open Vent Damper Carton and remove InstallationInstructions. Read Installation Instructionsth
35Figure 29: Typical Vent System9. Design vent system for sea level input.10. Provide adequate ventilation of Boiler Room. SeeSection I: Pre-Installat
36VII. ElectricalA. Install Boiler Wiring1. Knockdown boilers only. Locate wiring harnesses inCombination Boiler Parts and Control Carton. Referto T
37E. Alliance Water Heater (if used). May be used withIntermittent Circulation only.Refer to Alliance Installation, Operating andService Instructions
381. Standing Pilot (24) Sequence of Operationa. Normal Operationi. Thermostat or operating control calls forheat. Vent Damper (if used) opens.ii. Ga
39Figure 31: Wiring Diagram, Standing Pilot (24), USA and Canada, Continuous Circulation
4Table of ContentsI. Pre-Installation ... 6II. Boiler Assembly ...
40Figure 32: Wiring Diagram, Standing Pilot (24V), USA and Canada, Intermittent Circulation
412. Electronically Supervised Standing Pilot (OP)Sequence of Operationa. Normal Operationi. Thermostat or operating control calls forheat.ii. Termina
42Figure 33: Wiring Diagram, OP/OP-CSD-1 Ignition System, Continuous Circulation
43Figure 34: Wiring Diagram, OP/OP-CSD-1 Ignition System, Intermittent Circulation
444. Honeywell EI Sequence of Operationa. Normal Operationi. Thermostat or operating control calls forheat. Vent Damper (if used) opens.ii. Ignition
45Figure 35: Wiring Diagram, Honeywell EI, USA, Continuous Circulation
46Figure 36: Wiring Diagram, Honeywell EI, USA, Intermittent Circulation
47Figure 37: Wiring Diagram, Honeywell EI, Canada, Continuous Circulation
48Figure 38: Wiring Diagram, Honeywell EI, Canada, Intermittent Circulation
495. Johnson EI Sequence of Operationa. Normal Operationi. Thermostat or operating control calls forheat. Vent Damper (if used) opens.ii. Ignition Mo
5Table 1: Dimensional DataFigure 1: Dimensional DatarelioBledoM.oN)sehcnI(snoisnemiDdednemmoceReziSyenmihC)dnuoR(retaWtnetnoC)snollaG(.xorppAgnippihSt
50Figure 39: Wiring Diagram, Johnson EI, USA, Continuous Circulation
51Figure 40: Wiring Diagram, Johnson EI, USA, Intermittent Circulation
52Figure 41: Wiring diagram, Johnson EI, Canada, Continuous Circulation
53Figure 42: Wiring Diagram, Johnson EI, Canada, Intermittent Circulation
546. Electronically Supervised Intermittent Ignition(EP/EP-CSD-1) Sequence of Operationa. Normal Operationi. Thermostat or operating control calls fo
55Figure 43: Wiring Diagram, EP/EP-CSD-1 Ignition System, USA, Continuous Circulation
56Figure 44: Wiring Diagram, EP/EP-CSD-1 Ignition System, USA, Intermittent Circulation
57Figure 46: McDonnell & Miller PS-851 (120V) L.W.C.O. Wiring for Boilers with 120V Limit Circuits (OP & EP)Figure 45: McDonnell & Mille
58Figure 47: Hydrolevel OEM - 170/550/650/750 (120V) L.W.C.O. Wiring for Boilers with 24V Limit CircuitsFigure 48: Hydrolevel OEM - 170/550/650/750
59VIII. System Start-upA. Safe operation and other performance criteria were metwith the gas manifold and control assembly providedon boiler when boil
6I. Pre-Installationa. Front: 18"b. Top: 36"c. Draft hood, rear, sides and flue connector: 6"2. USA, 808B-810B: for installation in
60Figure 49: Lighting Instructions (24V Standing Pilot)
61Figure 50: Operating Instructions (EI)
62Figure 51: Lighting Instructions (OP)
63Figure 52: Operating Instructions (EP)
64Figure 53: Lighting / Operating Instructions (OP/EP-CSD-1)SNOITCURTSNIGNITAREPORELIOB:NWODTUHSOT.1tolipdna)s(evlavffo-tuhsniamlaunamesolC.)s(evlav.
65Figure 54: Honeywell Q314 Pilot Flame(24V Standing Pilot)Figure 57: Honeywell Q179D Pilot Flame (OP)Figure 55: Honeywell Q348 Pilot Flame(24V Ele
66Yellow-tipping indicates lack of primary air. Improperburner alignment on Main Burner Orifice will alsoaffect primary air injection. Adjust primary
67Table 12: Input Rateb. Increase input rate if less than 98% of rating plateinput. Increase manifold gas pressure no morethan 0.3 inch w.c. If measur
68IX. ServiceA. General. Inspection and service must be conductedannually. Turn off electrical power and gas supplywhile conducting service or mainten
69Warning:This product contains refractory ceramic fibers (RCF). RCF has been classifiedas a possible human carcinogen. After this product is fired,
7a. If result is greater than or equal to 50 ft³ per 1,000Btuh, space is considered an unconfined space.b. If result is less than 50 ft³ per 1,000 Btu
70Figure 60: Boiler Flueway CleaningTable 13: Pilot Burner Location.oNledoMrelioBneewteBdetacoLtoliP*srenruBB5085&4B6086&5B7087&6B8087&
71Honeywell EI Trouble Shooting Guide
72Johnson EI Trouble Shooting Guide
73
74SERVICE RECORDDATE SERVICE PERFORMED
75X. Repair PartsAll Series 8B Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require assistancein locatin
76metI.oNnoitpircseD.oNtraPytitnauQB508B608B708B808B908B018ylbmessAregnahcxEtaeH.11etelpmoC50617161---------------6061716---1------------7061716------
77metI.oNnoitpircseD.oNtraPytitnauQB508B608B708B808B908B018yponaC.2A2yponaC50611161--------------------6061116----1----------------7061116--------1---
78metI.oNnoitpircseD.oNtraPytitnauQB508B608B708B808B908B018.3ylbmessAesaBA3lenaPdnEesaB1061817222222B3ylbmessAlennahCesaB250618162---------------26061
79metI.oNnoitpircseD.oNtraPytitnauQB508B608B708B808B908B018.4srenruBniaMdnadlofinaMA4renruBniaM206132880121517191B4gnidnatS,tekcarBtoliPhtiwrenruBniaM
8A. Remove Crate (Semi-Pak and Packaged Only)1. Remove all fasteners at crate skid.2. Lift outside container and remove with all otherinside protectiv
80METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQ)PO,V42(toliPgnidnatS--niarTsaG1-5saGPL&larutaN,noitceS7&6,adanaC&ASU:V42saGPL&larutaN,noitc
81METI.ONNOITPIRCSEDREBMUNTRAPYTITNAUQ)1-DSC-PO(toliPgnidnatS--niarTsaG2-5ylnOsaGPL,noitceS01,ylnOASU:1-DSC-POATPN"1,saGPL,C7S-CHREVG0007wahstreb
82METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQ)IE(noitingItnettimretnI-niarTsaG3-5saGPLdnalarutaN,noitceS01-5:ASUsaGlarutaN,noitceS01-5:adanaCsaGPL,noitce
83METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQ)PE(noitingItnettimretnI-niarTsaG4-5ylnOsaGlarutaN,noitceS01-6:adanaC&ASUA TPN"1,saGlarutaN,C7S-CHR
84METI.ONNOITPIRCSEDREBMUNTRAPYTITNAUQ)1-DSC-PE(noitingItnettimretnI-niarTsaG5-5ylnOsaGlarutaN,noitceS01-8,ylnOASUATPN"1,saG.taN,C7S-CHREVG0007wa
85METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQ)V42(toliPgnidnatS--gnipiPdnaylbmessAtoliP6-5saGPLdnalarutaN,noitceS7&6:adanaC&ASUAsaGlarutaN,7863A4
86METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQASU)IEllewyenoH(noitingItnettimretnI-gnipiPdnaylbmessAtoliP7-5saGPLdnalarutaN,noitceS01-5AsaGlarutaN,2001A84
87METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQadanaC)IEllewyenoH(noitingItnettimretnI--gnipiPdnaylbmessAtoliP8-5saGlarutaN,noitceS01-5saGPL,noitceS7-5AsaG
88METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQASU)IEnosnhoJ(noitingItnettimretnI--gnipiPdnaylbmessAtoliP9-5saGPLdnalarutaN,noitceS01-5AsaGlarutaN,5227WYL1
89METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQadanaC)IEnosnhoJ(noitingItnettimretnI--gnipiPdnaylbmessAtoliP01-5saGlarutaN,noitceS01-5saGPL,noitceS7-5AsaGl
9Figure 4: Installation of Special Base for Combustible Flooring5. Roll boiler until 3" roller is located as shown. Usepry bar to install wood bl
90METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQ)PO(toliPgnidnatS--gnipiPdnaylbmessAtoliP11-5saGPLdnalarutaN,noitceS01-6:adanaC&ASUAsaGlarutaN,8001D971Q
91METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQ)1-DSC-PO(toliPgnidnatS--gnipiPdnaylbmessAtoliP21-5ylnOsaGPL,noitceS01-8:ylnOASUAsaGPL,ecifirODK641883/w8001
92METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQ)PE(noitingItnettimretnI--gnipiPdnaylbmessAtoliP31-5ylnOsaGlarutaN,noitceS01-6:adanaC&ASUAsaGlarutaN,900
93METI.ONNOITPIRCSEDTRAPREBMUNEZISYTITNAUQ)1-DSC-PE(noitingItnettimretnI--gnipiPdnaylbmessAtoliP41-5ylnOsaGlarutaN,noitceS01:ylnOASUA,renruBtoliP9001C
94
95metI.oNnoitpircseD.oNtraPytitnauQB508B608B708B808B908B018tekcaJ.66etelpmoC150614061---------------16061406---1------------17061406------1---------18
96metI.oNnoitpircseDoNtraP.ytitnauQB508B608B708B808B908B018deunitnoC(tekcaJ.6)F6lenaPediStfeLtekcaJ1061406 111111G6lenaPediSthgiRtekcaJ2061406 111111H
98metI.oNnoitpircseD.oNtraPytitnauQB508B608B708B808B908B018slortnoCsuoenallecsiMdnamirT.7AllewyenoH,F°022-041,timiL;)toliPgnidnatS&IE(8121D0804L)P
99metI.oNnoitpircseD.oNtraPytitnauQB508B608B708B808B908B018.8repmaDtneVcitamotuAdnadooHtfarDA8dooHtfarD50611181---------------4061118---*1------------
Comments to this Manuals