FIG. 31
INSTALLATION OF S8610M MODULE
EI Control System
1. INSTALLATION OF GAS VALVE TRANSFORMER
AND PILOT PIPING (for Robertshaw Pilot Piping,
see Fig. 32) – Attach the bracket for mounting of the
junctionboxtothelowerfrontcorneroftheJacket
UpperEndPanelusingtwo#10-32x½”MSandnuts.
Mountjunctionboxtobracketusing#8SMS,seeFig.
27 or 29. Connect pilot solenoid valve to bottom center
knockoutofJ-boxusingconduitttingsfurnished,
(V88 Gas Train only) see Fig. 33. Mount transformer
onJ-box.IfFootMountedTransformer,connectto
J-boxwithStraightConnector,BX,StraightConnector
and ½” pipe coupling. Drill holes in Jacket and fasten
Transformer using SMS. Install RV-12LT pilot line
regulator (packed in Gas Train Carton) and other 1/8”
pipettingsasshowninSectionVI,RepairParts(V88
Gas Train only).
Using ¼” OD aluminum tubing, connect the inlet of
the pilot solenoid valve to the pilot valve installed in
the manual shut off valve in the Gas Train. Using ¼”
aluminum tubing, complete installation to Pilot Burner,
see Fig. 33 (V88 Gas Train only).
2. INSTALLATION OF BLEED PIPING (V88 Gas Train
only) – Using ¼” OD aluminum tubing, install a bleed
line on both diaphragm gas valves, connect together,
and, on USA boilers, run tubing to bleed line protruding
from inside base, see Fig. 33. On boilers installed in
Canada, run bleed line to outdoors.
FIG. 32
PILOT PIPING - EI CONTROL SYSTEM (Robertshaw7000)
U.S.A. 5006B THRU 5009B
SECTION III – INSTALLATION INSTRUCTIONS (continued)
WITH GAS SUPPLY “OFF” and Service Piping
connected to the boiler, open Manual Valve(s) and
pilot valve(s) at end of Gas Train(s) and reduce
pressure to ½ lb. gage pressure. Using soap solution
or other approved method check gas train piping,
pilotpiping,bleedpipingandoricesforleaks.
3. INSTALLATIONANDWIRINGOFS8610M
IGNITIONCONTROLMODULE–Usingtwo#10-32
x2”MS,andnuts,installtheS8610Mmodulebracket
on the manifold just to the right of the main burner
withpilot,seeFig.31.Usingtwo#6x¾”SMS,install
theS8610Mmoduleonthebracket.Connectthetwo
wiresfromtheQ3481BpilottotheS8610Mmoduleas
shown on Fig. 42, 43 or 44.
a.GroundWire(200ºC)to“BNRGND”terminal
b. Ignition Sensor Wire to “Spark” terminal
Secure these wires to Pilot Piping with Wire Tie to
provide strain relief.
Using wiring harness furnished, connect leads with
push-onterminalsonS8610Mmoduleasshownin
Fig. 42, 43 or 44. Run harness outside of jacket on
underside of manifold and secure in this position
withWireTiesfurnished.Connectthesixwiresin
theharnesstothespeciedcontrolsasshowninFig.
42, 43 or 44.